Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Chrysler Building
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==== Basement ==== <span class="anchor" id="Subway entrance"></span>On the 42nd Street side of the Chrysler Building, a staircase from the street leads directly under the building to the [[New York City Subway]]'s {{NYCS trains|Grand Central}} at [[Grand Central–42nd Street station]].<ref>{{Cite NYCS map|neighborhood|Midtown East}}</ref> It is part of the structure's original design.{{sfn|Stern|Gilmartin|Mellins|1987|p=609}}<ref>{{Cite news|issn=0362-4331|url=https://timesmachine.nytimes.com/timesmachine/1929/11/24/317430812.pdf |archive-url=https://web.archive.org/web/20191122191228/https://timesmachine.nytimes.com/timesmachine/1929/11/24/317430812.pdf |archive-date=November 22, 2019 |url-status=live|title=Subway Construction Planned For the Chrysler Building|date=November 24, 1929|work=The New York Times|access-date=November 2, 2017}}</ref> The [[Interborough Rapid Transit Company]], which at the time was the operator of all the routes serving the 42nd Street station, originally sued to block construction of the new entrance because it would cause crowding,<ref>{{cite news|title=I.R.T. Fights Passage To Chrysler Building|work=The New York Times|date=January 3, 1930|issn=0362-4331|url=https://timesmachine.nytimes.com/timesmachine/1930/01/03/96016116.pdf |archive-url=https://web.archive.org/web/20210106152134/https://timesmachine.nytimes.com/timesmachine/1930/01/03/96016116.pdf |archive-date=January 6, 2021 |url-status=live|access-date=November 4, 2017}}</ref> but the [[New York City Board of Transportation]] pushed to allow the corridor anyway.<ref>{{cite web|title=Transit Board To Test I.R.T. Bar On Passage|work=The New York Times|date=January 13, 1930|issn=0362-4331|url=https://timesmachine.nytimes.com/timesmachine/1930/01/13/92060547.pdf |archive-url=https://web.archive.org/web/20210811211728/https://timesmachine.nytimes.com/timesmachine/1930/01/13/92060547.pdf |archive-date=August 11, 2021 |url-status=live|access-date=November 4, 2017}}</ref> Chrysler eventually built and paid for the building's subway entrance.{{sfn|Landmarks Preservation Commission|1978|p=4}} Work on the new entrance started in March 1930<ref>{{Cite news|issn=0362-4331|url=https://timesmachine.nytimes.com/timesmachine/1930/03/22/96077616.pdf |archive-url=https://web.archive.org/web/20210126174139/https://timesmachine.nytimes.com/timesmachine/1930/03/22/96077616.pdf |archive-date=January 26, 2021 |url-status=live|title=TO Begin Chrysler Tunnel; To Connect Skyscraper With Grand Central Terminal and Subway.|date=March 22, 1930|work=The New York Times|access-date=November 10, 2017}}</ref> and it opened along with the Chrysler Building two months later.<ref>{{Cite news|issn=0362-4331|url=https://timesmachine.nytimes.com/timesmachine/1930/05/29/96136569.pdf |archive-url=https://web.archive.org/web/20210811212226/https://timesmachine.nytimes.com/timesmachine/1930/05/29/96136569.pdf |archive-date=August 11, 2021 |url-status=live|title=New Building Linked to Subway.|date=May 29, 1930|work=The New York Times|access-date=November 10, 2017}}</ref> The basement also had a "hydrozone water bottling unit" that would filter tap water into drinkable water for the building's tenants. The drinkable water would then be bottled and shipped to higher floors.<ref>{{cite news|work=The New York Times|title=Answers About the Chrysler Building|first=David|last=Stravitz|date=December 11, 2009|url=https://cityroom.blogs.nytimes.com/2009/12/11/answers-about-the-chrysler-building-part-3/|access-date=November 3, 2017}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Chrysler Building
(section)
Add topic