Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Kingsway Tunnel
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==History== Annual vehicle usage of the [[Queensway Tunnel]] had exceeded 11 million by 1959, causing severe traffic congestion at peak commute times, partially as a result of low toll costs. It was evident that a significant capacity increase was required, with considerations on various bridge and tunnel schemes ultimately concluding with a second tunnel as the favoured option, funded by tolls. In 1965, parliamentary powers granted construction of a new two-lane tunnel, approximately 1 mile downstream from the existing tunnel. A further [[Bill (law)|bill]] for the tunnel's construction was promoted in 1967 with approval given in 1968, upon which construction started immediately.<ref>{{cite web |url=http://www.tunnelusers.org.uk/TollsTaskGroup7jan2016LegalContextOverview.pdf |title=Merseytravel Report on Mersey Tunnels Historical Legislation Overview |work=[[Pinsent Masons]] |via=tunnelusers.org.uk |date=18 September 2015 |access-date=16 October 2021}}</ref> ===Construction{{anchor|Mersey Tunnel (Liverpool/Wallasey) &c. Act 1965|Mersey Tunnel (Liverpool/Wallasey) Act 1968}}=== {{Infobox UK legislation | short_title = Mersey Tunnel (Liverpool/Wallasey) &c. Act 1965 | type = Act | parliament = Parliament of the United Kingdom | long_title = An Act to authorise the construction of a tunnel under the river Mersey between Liverpool and Wallasey, approaches to such tunnel and street works in connection therewith; to confer further powers on the lord mayor, aldermen and citizens of the city of Liverpool and the mayor, aldermen and burgesses of the county borough of Wallasey; to reconstitute the Mersey Tunnel Joint Committee; and for other purposes. | year = 1965 | citation = [[List of acts of the Parliament of the United Kingdom from 1965|1965]] c. xl | introduced_commons = | introduced_lords = | territorial_extent = | royal_assent = 5 August 1965 | commencement = | expiry_date = | repeal_date = | amends = | replaces = | amendments = {{ubli|[[County of Merseyside Act 1980]]|[[Mersey Tunnels Order 1986]] (SI 1986/297)}} | repealing_legislation = | related_legislation = | status = amended | legislation_history = | theyworkforyou = | millbankhansard = | original_text = https://www.legislation.gov.uk/ukla/1965/40/pdfs/ukla_19650040_en.pdf | revised_text = | use_new_UK-LEG = | UK-LEG_title = | collapsed = yes }} {{Infobox UK legislation | short_title = Mersey Tunnel (Liverpool/Wallasey) Act 1968 | type = Act | parliament = Parliament of the United Kingdom | long_title = An Act to authorise the construction of a tunnel under the river Mersey between Liverpool and Wallasey; and for other purposes. | year = 1968 | citation = [[List of acts of the Parliament of the United Kingdom from 1968|1968]] c. xii | introduced_commons = | introduced_lords = | territorial_extent = | royal_assent = 30 May 1968 | commencement = | expiry_date = | repeal_date = | amends = | replaces = | amendments = {{ubli|[[County of Merseyside Act 1980]]|[[Mersey Tunnels Order 1986]] (SI 1986/297)}} | repealing_legislation = | related_legislation = | status = amended | legislation_history = | theyworkforyou = | millbankhansard = | original_text = https://www.legislation.gov.uk/ukla/1968/12/pdfs/ukla_19680012_en.pdf | revised_text = | use_new_UK-LEG = | UK-LEG_title = | collapsed = yes }} The project was authorised by the Mersey Tunnel (Liverpool/Wallasey) &c. Act 1965 (c. xl). [[BAM Nuttall|Edmund Nuttall Limited]].<ref>[http://jisc.iceknowledge.com/ArticleView.aspx?doi=10.1680/iicep.1972.5829 ICE Virtual Tour]{{dead link|date=November 2017 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> Construction took around five years to fully complete. The approach to the tunnel on the Wirral side uses the former railway cutting that carried the [[Seacombe railway station|Seacombe branch line]].<ref name="tunnelusers">{{cite web |url=http://www.tunnelusers.org.uk/history.htm |title=Mersey Tunnel Users Association β History |work=Tunnel Users |access-date=12 April 2017}}</ref> It was officially opened by [[Elizabeth II of the United Kingdom|Queen Elizabeth II]] on 24 June 1971. At first, only the southernmost tunnel was open for traffic, one lane in each direction. The northernmost tunnel was completed in 1974 and opened to traffic on 13 February 1974. === Mersey Tunnel 10k === There is an annual [[10K run|10k run]] that passes through the Kingsway Tunnel, starting in Liverpool city centre with the finish line in [[New Brighton, Merseyside|New Brighton]]. This is the only time during the year when one can travel through the tunnel on foot. In 2024, more than 2,000 people registered to take part in the event.<ref>{{Cite web |date=2024-04-11 |title=Thousands set to run Mersey Tunnel 10K this weekend |url=https://www.wirralglobe.co.uk/news/24244645.thousands-set-run-mersey-tunnel-10k-weekend/ |access-date=2024-04-13 |website=Wirral Globe |language=en}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Kingsway Tunnel
(section)
Add topic